July 2019 Visa Bulletin
Data verified October 22, 2026
Your line
Or go straight to a category history
F2A approval date for most countries opens to everyone.
One-page glance, for sharing or printing →C = Current. U = Unavailable.
C = Current. U = Unavailable.
C = Current. U = Unavailable.
C = Current. U = Unavailable.
What changed in the July 2019 bulletin
- F2A All countries Open to everyone on the approval chart.
- F4 Mexico Cutoff now January 1, 1997.
- F1 Mexico Cutoff now August 1, 1996.
- F3 Mexico Cutoff now July 1, 1995.
- F4 the Philippines Cutoff now January 1, 1998.
- F3 the PhilippinesLargest in our archive Cutoff now August 1, 1997.
- F2B Most countries · China · IndiaLargest in our archive The same move for most countries, China, and India.
- F3 Most countries · China · IndiaLargest in our archive The same move for most countries, China, and India.
- F4 Most countries · China The same move for most countries and China.
- F1 the Philippines Cutoff now August 22, 2007.
- F2B the Philippines Cutoff now January 1, 2008.
- F2B Mexico Cutoff now April 15, 1998.
- F1 Most countries · China · India The same move for most countries, China, and India.
- F4 India Cutoff now August 22, 2004.
- EB-3 the Philippines Open to everyone on the approval chart.
- EB-3 Other Workers the Philippines Open to everyone on the approval chart.
- EB-5 India A cutoff returns, at May 1, 2017.
- EB-5 Regional Center India A cutoff returns, at May 1, 2017.
- EB-4 Mexico Cutoff now July 1, 2016.
- EB-4 Religious Workers Mexico Cutoff now July 1, 2016.
- EB-3 China Cutoff now January 1, 2016.
- EB-4 El Salvador/Guatemala/HondurasLargest since 2016 Cutoff now July 1, 2016.
- EB-4 Religious Workers El Salvador/Guatemala/Honduras Cutoff now July 1, 2016.
- EB-2 China Cutoff now November 1, 2016.
- EB-3 Other Workers China Cutoff now November 22, 2007.
- EB-1 China Cutoff now May 8, 2017.
- EB-2 India Cutoff now April 24, 2009.
In brief
- 62 of 154 cutoff entries moved; 5 moved back.
- Largest move: F2A for all countries, opened to everyone.
- Approval dates (from the official Final Action Dates chart) moved in 5 family-sponsored categories and 8 employment-based categories.
- 2 categories set a single-bulletin record in our archive (since Oct 2015): F3, F2B.
EB-3 approval date for the Philippines opens to everyone. For F3 (the Philippines), this is the largest single-bulletin F3 advance in our archive (since Oct 2015).
Read the full breakdown of the July 2019 bulletin
For F2B (most countries, China, and India), this is the largest single-bulletin F2B advance in our archive (since Oct 2015). For F3 (most countries, China, and India), this is the largest single-bulletin F3 advance in our archive (since Oct 2015).
From the Department’s notes for July 2019
7 sections, reproduced verbatim from the U.S. Department of State’s July 2019 Visa Bulletin. The Department’s words, not ours.
A. STATUTORY NUMBERS
This bulletin summarizes the availability of immigrant numbers during July for: “Final Action Dates” and “Dates for…
From the bulletin:
This bulletin summarizes the availability of immigrant numbers during July for: “Final Action Dates” and “Dates for Filing Applications,” indicating when immigrant visa applicants should be notified to assemble and submit required documentation to the National Visa Center.
Unless otherwise indicated on the U.S. Citizenship and Immigration Services (USCIS) website at www.uscis.gov/visabulletininfo , individuals seeking to file applications for adjustment of status with USCIS in the Department of Homeland Security must use the “Final Action Dates” charts below for determining when they can file such applications. When USCIS determines that there are more immigrant visas available for the fiscal year than there are known applicants for such visas, USCIS will state on its website that applicants may instead use the “Dates for Filing Visa Applications” charts in this Bulletin.
1. Procedures for determining dates. Consular officers are required to report to the Department of State documentarily qualified applicants for numerically limited visas; USCIS reports applicants for adjustment of status. Allocations in the charts below were made, to the extent possible, in chronological order of reported priority dates, for demand received by June 6th . If not all demand could be satisfied, the category or foreign state in which demand was excessive was deemed oversubscribed. The final action date for an oversubscribed category is the priority date of the first applicant who could not be reached within the numerical limits. If it becomes necessary during the monthly allocation process to retrogress a final action date, supplemental requests for numbers will be honored only if the priority date falls within the new final action date announced in this bulletin. If at any time an annual limit were reached, it would be necessary to immediately make the preference category “unavailable”, and no further requests for numbers would be honored.
2. Section 201 of the Immigration and Nationality Act (INA) sets an annual minimum family-sponsored preference limit of 226,000. The worldwide level for annual employment-based preference immigrants is at least 140,000. Section 202 prescribes that the per-country limit for preference immigrants is set at 7% of the total annual family-sponsored and employment-based preference limits, i.e., 25,620. The dependent area limit is set at 2%, or 7,320.
3. INA Section 203(e) provides that family-sponsored and employment-based preference visas be issued to eligible immigrants in the order in which a petition in behalf of each has been filed. Section 203(d) provides that spouses and children of preference immigrants are entitled to the same status, and the same order of consideration, if accompanying or following to join the principal. The visa prorating provisions of Section 202(e) apply to allocations for a foreign state or dependent area when visa demand exceeds the per-country limit. These provisions apply at present to the following oversubscribed chargeability areas: CHINA-mainland born, EL SALVADOR, GUATEMALA, HONDURAS, INDIA, MEXICO, PHILIPPINES, and VIETNAM.
4. Section 203(a) of the INA prescribes preference classes for allotment of Family-sponsored immigrant visas as follows:
FAMILY-SPONSORED PREFERENCES
First : ( F1 ) Unmarried Sons and Daughters of U.S. Citizens: 23,400 plus any numbers not required for fourth preference.
Second : Spouses and Children, and Unmarried Sons and Daughters of Permanent Residents: 114,200, plus the number (if any) by which the worldwide family preference level exceeds 226,000, plus any unused first preference numbers:
A. ( F2A ) Spouses and Children of Permanent Residents: 77% of the overall second preference limitation, of which 75% are exempt from the per-country limit;
B. ( F2B ) Unmarried Sons and Daughters (21 years of age or older) of Permanent Residents: 23% of the overall second preference limitation.
Third : ( F3 ) Married Sons and Daughters of U.S. Citizens: 23,400, plus any numbers not required by first and second preferences.
Fourth : ( F4 ) Brothers and Sisters of Adult U.S. Citizens: 65,000, plus any numbers not required by first three preferences.
In plain words: “Unavailable” (“U”) means paused; “retrogress” means move back; “chargeability area” means country of birth; “final action date” means approval date; “date for filing” means filing date.
C. THE DIVERSITY (DV) IMMIGRANT CATEGORY RANK CUT-OFFS WHICH WILL APPLY IN AUGUST
From the bulletin:
For August , immigrant numbers in the DV category are available to qualified DV-2019 applicants chargeable to all regions/eligible countries as follows. When an allocation cut-off number is shown, visas are available only for applicants with DV regional lottery rank numbers BELOW the specified allocation cut-off number:
Region
All DV Chargeability Areas Except
Those Listed Separately
AFRICA
CURRENT
ASIA
CURRENT
EUROPE
CURRENT
NORTH AMERICA (BAHAMAS)
CURRENT
OCEANIA
CURRENT
SOUTH AMERICA,
and the CARIBBEAN
CURRENT
In plain words: “chargeability area” means country of birth.
D. FAMILY-SPONSORED SECOND PREFERENCE VISA AVAILABILITY
F2A: This category has become "Current" for July, and is expected to remain so through September. This action has been…
From the bulletin:
F2A: This category has become "Current" for July, and is expected to remain so through September. This action has been taken in an effort to generate an increased level of demand. Despite the large amount of registered F2A demand, currently there are not enough applicants who are actively pursuing final action on their case to fully utilize all of the available numbers under the annual limit.
Once large numbers of F2A applicants do begin to have their cases brought to final action, it will be necessary to establish a date in an effort to control number use within the annual limit. Therefore, readers should be aware that this “Current” status will not continue indefinitely, but it is not possible to say at present how soon corrective action will be required.
In plain words: “Current” (“C”) means open to everyone.
E. MEXICO FAMILY-SPONSORED and EMPLOYMENT-BASED PREFERENCE VISA AVAILABILITY
From the bulletin:
As the end of the fiscal year approaches, it has been necessary to retrogress the Mexico F1, F3, F4, E4, and SR final action dates for July to keep issuances within the annual numerical limits. With the start of the new fiscal year in October, the final action dates will be returned to the latest dates established during FY-2019.
In plain words: “retrogress” means move back; “final action date” means approval date.
F. EMPLOYMENT-BASED FIFTH PREFERENCE VISA AVAILABILITY
As readers were advised might happen in item E of the June Visa Bulletin, India and Vietnam will each reach their…
From the bulletin:
As readers were advised might happen in item E of the June Visa Bulletin, India and Vietnam will each reach their per-country annual limit during July. This has resulted in the Vietnam date being held, and has required the imposition of a July final action date for India.
For August, both countries will become subject to the same final action date which applies to China-mainland born Employment Fifth preference (E5) applicants, and they will be for the remainder of the fiscal year.
Such action will only be temporary, with the E5 date for each advancing for October, the first month of fiscal year 2020, as follows:
India: Most likely advancing to the summer or fall of 2017.
Vietnam: Most likely advancing to the fall or early winter of 2016.
In plain words: “final action date” means approval date.
G. VISA AVAILABILITY IN THE COMING MONTHS FAMILY-sponsored categories (potential monthly movement)
Worldwide dates: F1: Up to five weeks F2A: CURRENT F2B: Up to six weeks F3: Up to six weeks F4: Up to one month…
From the bulletin:
Worldwide dates:
F1: Up to five weeks
F2A: CURRENT
F2B: Up to six weeks
F3: Up to six weeks
F4: Up to one month
EMPLOYMENT-based categories (potential monthly movement)
Employment First :
WORLDWIDE: Little if any forward movement. Increased demand may require temporary corrective action for September
China: Little if any forward movement
India: No forward movement. The date will return to February 22, 2017 for October
Employment Second :
Worldwide: Expected to remain Current, but temporary corrective action may be required for September
China: Up to four months
India: Up to one week
Employment Third :
Worldwide: Expected to remain Current, but temporary corrective action may be required for September
China: Up to several months
India: Little if any forward movement
Mexico: Will remain at the Worldwide date
Philippines: Will remain at the Worldwide date
Employment Fourth : Current for most countries
El Salvador, Guatemala, Honduras, and Mexico: Little if any movement through September.
Employment Fifth : The category will remain “Current” for most countries
China: Too early to predict whether it will be possible to advance the China date prior to October.
India and Vietnam will be subject to the same date as China during August and September.
The above final action date projections for the Family and Employment categories indicate what is likely to happen on a monthly basis through September. The determination of the actual monthly final action dates is subject to fluctuations in applicant demand and a number of other variables.
In plain words: “Current” (“C”) means open to everyone; “final action date” means approval date.
H. OBTAINING THE MONTHLY VISA BULLETIN
To be placed on the Department of State’s E-mail subscription list for the “Visa Bulletin”, please send an E-mail to…
From the bulletin:
To be placed on the Department of State’s E-mail subscription list for the “Visa Bulletin”, please send an E-mail to the following E-mail address:
and in the message body type:
Subscribe Visa-Bulletin
(example: Subscribe Visa-Bulletin)
To be removed from the Department of State’s E-mail subscription list for the “Visa Bulletin”, send an e-mail message to the following E-mail address :
and in the message body type: Signoff Visa-Bulletin
The Department of State also has available a recorded message with visa final action dates which can be heard at: (202) 485-7699 . The recording is normally updated on/about the 10th of each month with information on final action dates for the following month.
Readers may submit questions regarding Visa Bulletin related items by E-mail at the following address:
(This address cannot be used to subscribe to the Visa Bulletin.)
In plain words: “final action date” means approval date.
Get the movement, monthly
One email after each bulletin: what moved in your categories, from the archive. No spam, unsubscribe anytime.
One email after each bulletin. Privacy: dates you check are never stored — privacy policy.
Understanding the two charts
Approval dates
For issuing green cards: the approval date (from the official Final Action Dates chart). If your priority date is earlier than the date shown for your category and country, a visa number is available and your case can be approved. “Open to everyone” means every priority date can move forward this month; “Paused” means no visa numbers are available this month.
Filing dates
For submitting I-485 applications: the filing date (from the official Dates for Filing chart). It is the earliest priority date at which you may assemble and submit documents, ahead of approval, when USCIS says to use this chart for the month. It lets applicants get in line earlier while waiting for a visa number.